Figure 8. Proposed temporal pedestrian walkway (from 8am-8pm) Source: author’s pervious work in B.Arch. program

From

A Journey through the History: Introduction to Heritage Tourism and Tourist Trails for the Renewal of Old Dhaka

Dipa Saha, Sazdik Ahmed, Abu Towab Md. Shahriar, S. M. Naeem Hossain Mithun

American Journal of Civil Engineering and Architecture. 2017, 5(3), 98-107 doi:10.12691/ajcea-5-3-4