Figure B4. Optimized project cash flow chart in scenario III (outputdata)

From

Profitability Optimization of Construction Project Using Genetic Algorithm Cash Flow Model

Ismail M. Basha, Ahmed H. Ibrahim, Ahmed N. Abd El-Azim

American Journal of Civil Engineering and Architecture. 2016, 4(1), 17-27 doi:10.12691/ajcea-4-1-3