Figure B3. Optimized project cash flow chart for scenario II (output data).

From

Profitability Optimization of Construction Project Using Genetic Algorithm Cash Flow Model

Ismail M. Basha, Ahmed H. Ibrahim, Ahmed N. Abd El-Azim

American Journal of Civil Engineering and Architecture. 2016, 4(1), 17-27 doi:10.12691/ajcea-4-1-3