Figure 4. Plant control level: top (WPP control level), Middle (SPP control level), bottom (BESS control level)

From

Utility-Scale Wind-Based Hybrid Power Plants and Control Strategy

Shree Om Bade, Olusegun Tomomewo, Ajan Meenakshisundaram

Sustainable Energy. 2023, 11(1), 12-20 doi:10.12691/rse-11-1-2