Figure 5. Temperature profile in the wall for a 7-hour exposure period: (a) January; (b) August; (c) April

From

Modeling of Coupled Heat and Mass Transfers in a Building Envelope Made with BTC

Kabré Sayouba, Bayala Alfred, Ouedraogo Lareba Adélaide, Timbe N’Djédanoum, Moussa Dit Corneille Tarpilga, Bétaboalé Naon, Zougmoré François

Journal of Materials Physics and Chemistry. 2024, 12(2), 31-36 doi:10.12691/jmpc-12-2-2