Science and Education Publishing
From Scientific Research to Knowledge
Submission
Browse by Subjects
Search
Journal Home
For Authors
Online Submission
Current Issue
Archive
About Us
Figures index
From
Removal of Nitrogen by Bioreactor Method
Krishna Kumar, Omprakash Sahu
Journal of Environment Pollution and Human Health
.
2014
, 2(1), 16-22 doi:10.12691/jephh-2-1-4
Figure
1.
Nitrogen cycle
Full size figure and legend
Figure
2
.
Barnard Process
Full size figure and legend
Figure 3
.
Barnard Process in a Sequencing Batch Reactor
Full size figure and legend
Figure
4
.
Biomass Storage & Decay
Full size figure and legend
Figure 5
.
Nitrate nitrogen concentrations for initial reactor configuration. Aeration time was 8700 seconds; anaerobic stirring duration was 8700 seconds
Full size figure and legend
Figure 6
.
Nitrate nitrogen concentrations for second reactor configuration. Total aeration time was 13,800 seconds; total anaerobic stirring duration was 3600 seconds
Full size figure and legend
Figure 7
.
Nitrate nitrogen concentrations for final experiment. Total aeration time was about 18 hours; total anaerobic stirring duration was about 11 hours
Full size figure and legend
Figure 8
.
Nitrate nitrogen concentrations for the same test from . Results given for measured concentrations using the test kit (same as ) and without using the test kit
Full size figure and legend