Figures index

From

Multi-Objective Mixed Model Assembly Line Balancing Using Mixed Integer Linear Programming

Nafi Ahmed, Md. Sazzad Hossain Ador

American Journal of Industrial Engineering. 2020, 7(1), 14-25 doi:10.12691/ajie-7-1-3
  • Figure 1. Different parts of a T-shirt
  • Figure 2. Current layout of T-shirt line
  • Figure 3. Precedence diagram for T-shirt production line
  • Figure 4. Graphical representation of production rate of T-shirt
  • Figure 5. Different parts of Polo-shirt (Front View)
  • Figure 6. Different parts ofPolo-shirt sketch (Side View)
  • Figure 8. Precedence diagram for Polo-shirt production
  • Figure 9. Proposed layout of Mixed Model
  • Figure 10. Precedence diagram of proposed mixed model assembly line