Figure 6. Hybrid power plant control algorithm for active power control (SOC- State of charge of BESS; SOCmin -BESS minimum state of charge; SOCmax -BESS maximum state of charge)

From

Battery Uses for Regulating Active Power in Utility-scale Wind-based Hybrid Power Plant

Shree om Bade, Ajan Meenakshisundaram, Toluwase Omojiba, Olusegun Tomomewo

American Journal of Energy Research. 2023, 11(2), 82-92 doi:10.12691/ajer-11-2-3