Figures index

From

BIM Based Normative Calculations for Early Stages of Building Design

Hugo Sheward

American Journal of Civil Engineering and Architecture. 2021, 9(5), 181-202 doi:10.12691/ajcea-9-5-2
  • Figure 1. Directional air flow mapping in cubic feet per minute
  • Figure 2. Business Process Model of traditional PCD of laboratories (author)
  • Figure 3. LVDA user interface
  • Figure 4. HLCM Flow chart
  • Figure 5. LVDA Cooling Load feedback
  • Figure 6. WDCM user interface, project location window
  • Figure 7. WDCM Flow chart
  • Figure 8. DHAM Flow chart
  • Figure 9. MDM Flow chart
  • Figure 10. Derivation of intake points in interstitial typologies
  • Figure 11. Second level spatial adjacency derivation
  • Figure 12. SAAM Flow chart
  • Figure 13. DASA text-based error report
  • Figure 14. DASA Flow chart
  • Figure 15. Service Adjacency Graph, representation of the spatial layout in graph form
  • Figure 16. Set based representations based on the service adjacency graph
  • Figure 17. Spatial adjacency derivation through polygon offset
  • Figure 18. Adjacent spaces midpoint derivation
  • Figure 19. Point in polygon test diagram
  • Figure 20. Routing of the ventilation duct on convex spaces
  • Figure 21. Routing of the ventilation on concave spaces
  • Figure 22. Routing of the ventilation duct, red dot indicates start point, yellow dot indicates room connection, and black dot indicates circulation room vertex