Figure 2. The details of conservation of Rabsey. A. Inspection of the dismantled Rabsey in the courtyard in March 2003. B. Efforts to save the good components of the Rabsey in the workshop. C. A module of the Rabsey after intervention. D. The completed Rabsey till the first floor. E. The complete Rabsey after conservation. F. The Rabsey during the Buli Mani festival March 2005

From

Architectural Conservation of Decorative Timber Windows and Ornamental Columns at Buli Monastery

Dhrubaraj Sharma

American Journal of Civil Engineering and Architecture. 2017, 5(5), 204-207 doi:10.12691/ajcea-5-5-4