Figure 8. (a) Compacting the soil in layers (as CCL) in the barrier holder (b) Defected geomembrane with 5mm hole placed over CCL

From

Leachate Percolation through Failed Geomembrane of a Geo-Composite Soil Barrier

Agbenyeku Emem-Obong Emmanuel, Sam Akintayo Akinseye

World Journal of Environmental Engineering. 2015, 3(2), 52-57 doi:10.12691/wjee-3-2-4