The Agricultural Development Project aims to reduce rural poverty by improving and increasing agricultural production through a community-based approach to designing and implementing components that directly impact the lives of the poor in the participating provinces and districts. However, it is characterized by delays in implementation due to technical and socioeconomic factors. To improve this problem, the timely implementation of agricultural projects becomes more crucial. Thus, the purpose of this study in the DBE Nekemte district was to determine the variables influencing agricultural projects in the study area and analyze the causes of delay factors that have significant contributed to the delay in implementing agricultural projects. The study used an entire population of project owners and employees of banks whose position was above officer, and the survey was conducted by distributing questionnaires across the eligible respondents. The data was collected from 125 respondents. From the literature review, thirty-nine (39) delay factors were identified. Factors of delay under study were categorized into five main groups: project behaviour, consultants and stakeholders, bank-related, project owner, and macroeconomic factors, and then their impacts on delay were assessed using RII and regression analysis. The three most notable factors contributing to agricultural implementation delays were identified as: (1) inflation; (2) a shortage of equity contributions; and (3) a lack of utilization of the disbursed funds (used for another purpose). The study concluded that inflation-related delay factors had the significant impact on project implementation, followed by macroeconomic factors, and the second highest was missing utilization of the disbursed fund, followed by project owner-related delays, while delays in providing services for utilities such as water, electricity, etc; followed by consultants & stakeholders-related delays, exhibited the least causes of delay. This study can benefit stakeholders dealing with agricultural projects to mitigating and establish suitable solutions for overcoming the delay.
| [1] | W. Bank. Healthy Agriculture [Online] Available: https://www.worldbank.org/en/topic/agriculture/overview. |
| [2] | P. H., "Share of Economic Sectors in the GDP in Bangladesh," 2020. [Online]. Available: https:// www.statista.com/ statistics/ 438359/share-of-economic-sectors-in-the-gdp-in-bangladesh. |
| [3] | L. M. F. M. André Brasil Carvalho, Felipe de Sá Moreira and, Caio José Losada Reis, "Study on the factors of delay in construction works," Ambiente Construído, Porto Alegre, vol. 21, 2021.View Article |
| [4] | G. Y. Wendimu, "The challenges and prospects of Ethiopian agriculture," Cogent Food & Agriculture, 2021. |
| [5] | N. C. S. a. R. V. R. Krupesh A Chauhan, "The Analytic Hierarchy Process as a Decision-Support System in the Housing Sector: A Case Study," World Applied Sciences Journal 3 (4): 609-613, 2008, vol. 3, 2008. |
| [6] | Z. A. A. a. R. Y. Sunitha V. Doraisamy, "An Overview on the Issue of Delay in the Construction Industry," ResearchGate, 2017. |
| [7] | N. M. S. M.A. Othuman Mydin, M. Taib, and N. Mohd Alias, "Imperative Causes of Delays in Construction Projects from Developer's Outlook," MATEC Web of Conferences, vol. 10, 2014.View Article |
| [8] | F. O. Okafor, "Factors Influencing delays and cost overruns on construction Projects in Nigeria; propose mitigation strategy," MBA, Dublin Business School, 2016. |
| [9] | Sadi A. Assaf* and S. Al-Hejji, "Causes of delay in large construction projects," Science Direct [Project Management], 2006.View Article |
| [10] | F. J. F. P. K. Nevitt, Project Financing. 2000. |
| [11] | M. A. C. A. Khan, S. Khushnood, S. A. Masood, "Development of Econometric Models for Cost & Time Over-runs: An Empirical Study of Major Road Construction Projects in Pakistan," Technical Journal, vol. Vol. 20 No. IV-2015, 2015. |
| [12] | A. H/Mariam, "Causes and effects of project Implementation Delay on Loan Recovery Performance (The case of selected projects financed by Abebit H/Mariam Development Bank of Ethiopia)," MBA, Master’s Degree in Business Administration (MBA), Indira Gandhi National Open University, 2013. |
| [13] | A. Semere, "Determinants of Agricultural Projects Implementation Delays: The Case of Agricultural Projects Financed by Development Bank of Ethiopia," MA Thesis, St. Mary's University, 2019. |
| [14] | T. Tulu, "Determinants of Project Implementation Delay: The Case of Selected Projects Financed by Development Bank of Ethiopia " 10, Journal of Business and Administrative Studies 2018. |
| [15] | (2022). Revised Credit Policy |
| [16] | A. Olika. Agricultural Projects Financed in DBE Nekemte District. |
| [17] | D. B. o. E. N. District, "Agricultural Project Financing status," 2022. |
| [18] | M. Z. H. M. Dahalan, & Azmi, W. F. W. M., "Identifying the impact on Construction Cost Among Contractors," International Journal of Academic Research, 2022.View Article |
| [19] | L. J. Koskela, "WE NEED A THEORY OF CONSTRUCTION," ResearchGate, 2013. |
| [20] | M. C. Bekker, and Mashaba, J. T., "A critical review of agricultural related construction project failures at the Department of Agricultural, Rural Development and Environmental Affairs: Mpumalanga," South African Journal of Agricultural Extension, vol. Vol. 46, No. 1, 2018: 83 – 91, 2018.View Article |
| [21] | J. O. Yaw Frimpong, and Lynn Crawford, "Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study," International Journal of Project Management, vol. Volume 21, Issue 5, July 2003, Pages 321-326, 2003.View Article |
| [22] | R. S. G. Sweis, A. Abu Hammad, A. Shboul, "Delays in construction projects: The case of Jordan," International Journal of Project Management, 2007.View Article |
| [23] | N. M. Jevericov Tetelepta, and Abraham Tuanakotta, "An Analysis of Delay Causing Factors in Implementation of working construction Project (Case Study: Building of the Agriculture Office in Masohi. City, Central Maluku Regency)," International Journal of Advanced Engineering Research and Science (IJAERS), vol. Vol-6, Issue-11, Nov- 2019, 2019.View Article |
| [24] | André Brasil Carvalho, Luiz Maurício Furtado Maués, a. Felipe de Sá Moreira, and C. J. L. Reis, "Study on the factors of delay in construction works," 2021.View Article |
| [25] | V. T. N. Soo-Yong Kim, and Van Truong Luu "Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam” ResearchGate, Oct. 11 (Sun) ~ 14 (Wed) 2015 2015. |
| [26] | A. O. (Alex), "Agricultural Project Financed by Nekemte District," ed, 2022. |
| [27] | M. a. S. Sambasivan, Y.W., "Causes and Effects of Delays in Malaysian Construction Industry," International Journal of Project Management, 25, 517-526., 2007.View Article |
| [28] | O. Fagbenle, A. Adeyemi, and D. Adesanya, "The impact of non-financial incentives on bricklayers' productivity in Nigeria," Construction Management & Economics, vol. 22, pp. 899-911, 11/01 2004.View Article |
| [29] | R. Zelhendri Zen, Syamsuar, and Farida Ariani d, "Academic achievement: the effect of project-based online learning method and student engagement," Science Direct [Heliyon], 2022. |
| [30] | R. C. Rachel Davisa, Zoe Hildona, Lorna Hobbsa, and Susan Michie, "Theories of behaviour and behaviour change across the social and behavioral sciences: a scoping review," Taylor & Francis Group, 2015. |
| [31] | A. Qayyum, N. A. Abdullah, and M. Khatoon, "Factors Causing Absenteeism Among The Students Of Secondary Level Schools," vol. 30, pp. 11-25, 12/25 2017. |
| [32] | D. N. Gujarati, BASIC ECONOMETRICS. Gary Burke, 2006. |
| [33] | A. S. Hemanta Doloi, K.C. Iyer, Sameer Rentala, "Analyzing factors affecting delays in Indian construction projects," International Journal of Project Management, 2012. |
| [34] | A. B. Wan Mohamad, and Wan Afthanorhan "A Comparison of Partial Least Square Structural Equation Modeling (PLS-SEM) and Covariance Based Structural Equation Modeling (CB-SEM) for Confirmatory Factor Analysis," International Journal of Engineering Science and Innovative Technology (IJESIT), vol. Volume 2, no. Issue 5, September, 2013. |
| [35] | a. S. M. Muhammad Jamaluddin Thaheema Muhammad Irfan, "Effect of Stakeholder's conflicts on Project Constraints_ a tale of the construction industry," International Journal of Conflict Management, 2019. |
| [36] | K. Dagnaw, "Determinants of Successful Loan Repayment Performance In Project Financing In Case Of Development Bank Of Ethiopia Jimma District," MA, Master Of Art In Project Management And Finance, Jimma University, 2020. |