Factors Affecting Upstream Production Rate and Causing Reworks in Downstream Activities due to Activities Overlapping

Hossam H. Mohamed, Ahmed H. Ibrahim, Asmaa A. Soliman

American Journal of Civil Engineering and Architecture. 2021, 9(1), 1-8 doi:10.12691/ajcea-9-1-1
  • Table 1. A summary of factors affecting construction schedule according to different authors
  • Table 2. Summary of Changes Arising in Upstream Activities and Causing Reworks in Downstream Activities According to Different authors, Soliman [17]
  • Table 3. The (23) Changes Arising in Upstream Activities and Causing Reworks in Downstream Activities and its Category, Soliman [17]
  • Table 4. Details of Questionnaires Administered and the Rate of Return Soliman [17]
  • Table 5. Classification of the Surveyed Experts Based on Their Experience, Soliman [17]
  • Table 6. Changes Causing Reworks in Downstream Activities, Soliman [17]
  • Table 7. Rank of All changes and Highlights the Most Important Eight Changes, Soliman [17]
  • Table 8. Changes Causing Rework in Downstream Activities Before and After Ranking, Soliman [17]