Figure 4. The Top Important Eight Changes That Causing Reworks in Downstream Activities, Soliman [17]

From

Factors Affecting Upstream Production Rate and Causing Reworks in Downstream Activities due to Activities Overlapping

Hossam H. Mohamed, Ahmed H. Ibrahim, Asmaa A. Soliman

American Journal of Civil Engineering and Architecture. 2021, 9(1), 1-8 doi:10.12691/ajcea-9-1-1