Table 3. The (23) Changes Arising in Upstream Activities and Causing Reworks in Downstream Activities and its Category, Soliman [17]

From

Factors Affecting Upstream Production Rate and Causing Reworks in Downstream Activities due to Activities Overlapping

Hossam H. Mohamed, Ahmed H. Ibrahim, Asmaa A. Soliman

American Journal of Civil Engineering and Architecture. 2021, 9(1), 1-8 doi:10.12691/ajcea-9-1-1