Figure 6. Illustration of conditions (1) and (2)

From

Discrete Time-Cost Tradeoff Model for Optimizing Multi-Mode Construction Project Resource Allocation

Shuangshuang Nie, Jihong Gao

American Journal of Civil Engineering and Architecture. 2015, 3(3A), 9-16 doi:10.12691/ajcea-3-3A-2